Ingeniería Industrial
Permanent URI for this collection
Browse
Browsing Ingeniería Industrial by Subject "Análisis de Factibilidad"
Now showing 1 - 1 of 1
Results Per Page
Sort Options
Item Análisis de factibilidad para la construcción de horno túnel en una empresa ladrillera(Universidad Santiago de Cali, 2019) Zúñiga Sinisterra, María Nela; Benavides Narvàez, Anyela Yolima; Martínez Escobar, NathalyIn the present article an analysis of the feasibility is shown, which was taken into account a market study, a technical-operative and economic study to determine the goodness of building an oven in the La Samaritana brick factory. This presentation in the process of drying and baking in the following problem: accumulation of material in process, underutilization of the area, nonconforming product, environmental problems and little competitiveness in the market. With the realization of the feasibility study, the very useful tool in the pre-operative phase of a project, the possibilities of success of the investment project can be presented to the management of the company. To carry out the feasibility study, take into account in the same place where the main needs of the operation can be known, the function used in the field that included the taking of data of the times of the production process, with this information An analysis of the faults presented at each moment was made. then a market study was carried out in the municipalities of the south of Valle del Cauca to determine the unmet potential demand, using secondary information from government agencies, books and company information; The economic analysis was necessary. Collect the financial information of the company. Depreciation and amortization was determined and the foregoing was determined by conducting a financial analysis. economic criteria that take into account the value of money over time. The main results of the study were obtained in the process. The result was: the writing of the production of 340,000 pieces / month to 1,000,000 pieces / month, the operation times. Drying and cooking time simultaneously; with the study of the market it is concluded that the organization is very competitive in terms of prices due to the results found in the principles of the main competences, and with the financial evaluation an IRR of 172% and a net real value is obtained greater than zero which means that the investment is feasible.