Propuesta de control inventarios en la bodega de materiales para un consorcio de construcción en cali
dc.contributor.advisor | Guaita, Wilfredo (Director) | |
dc.contributor.author | Ramírez Ramírez, Valery | |
dc.contributor.author | Ramírez Aviles , Richard Mauricio | |
dc.contributor.author | Rendon Alarcon, Nicolas | |
dc.creator.degree | Trabajo de Grado para optar al título de Ingeniero Industrial | |
dc.date.accessioned | 2025-08-15T21:54:51Z | |
dc.date.available | 2025-08-15T21:54:51Z | |
dc.date.issued | 2025 | |
dc.description | Para afrontar el problema de la administración ineficiente de inventarios en el almacén principal de un consorcio de construcción en Cali, se estudió el desarrollo de una propuesta de control de inventarios con la estructura del al ciclo Deming. La propuesta hace uso del análisis ABC, el cálculo del pedido optimo, y la aplicación de las tecnologías de la información y comunicación (TIC) para el seguimiento de mercancía. Primero se agruparon los elementos de la muestra en tres categorías para identificar los elementos más valiosos según su costo. Posteriormente, con el cálculo del pedido optimo se establecieron cinco propuestas para la política. Además, se realizó una segmentación de inventario con las cantidades “Q” optimas y se comparó con la muestra para observar cambios en las prioridades con el modelo implementado. A continuación, se obtuvieron los costos totales del inventario de muestra y el inventario “Q”, observando una reducción de los costos totales asociados al pedido en 85.56% y aumento en los de mantenimiento de inventario por 4.93% con el modelo. Finalmente se seleccionó uno de entre cinco propuestas de software mediante en análisis jerárquico de Saaty, como herramienta de apoyo al seguimiento de los insumos mediante el modelo primero en entrar, primero en salir. En conclusión, con el modelo se esperaría una mejora en la eficacia operativa y reduciendo de los costos totales asociados al inventario, enfocando la atención en los elementos más valiosos del almacén y apoyándose en el software seleccionado para su vigilancia y mejora continua del modelo | |
dc.description.abstract | To address the issue of inefficient inventory management in the main warehouse of a construction consortium in Cali, a proposal for inventory control was developed using the structure of the Deming cycle. The proposal incorporates ABC analysis, the calculation of the optimal order quantity, and the application of information and communication technologies (ICT) for merchandise tracking. First, the sample elements were grouped into three categories to identify the most valuable items based on their cost. Subsequently, the optimal order quantity was calculated, leading to five policy proposals. Additionally, inventory segmentation was performed using optimal "Q" quantities, and a comparison was made with the sample to observe priority changes with the implemented model. Next, the total costs of the sample inventory and the "Q" inventory were obtained, revealing an 85.56% reduction in total ordering costs and a 4.93% increase in inventory holding costs with the model. Finally, one of five software proposals was selected through Saaty's hierarchical analysis as a support tool for tracking supplies using the first-in, first-out model. In conclusion, the proposed model is expected to improve operational efficiency and reduce total inventory-related costs by focusing attention on the most valuable warehouse items and leveraging the selected software for monitoring and continuous model improvement. | |
dc.format | application/pdf | |
dc.format.extent | 14 Páginas | |
dc.identifier.citation | Ramírez Ramírez, V., Ramírez Aviles, R. M., & Rendon Alarcon, N. (2025). Propuesta de control inventarios en la bodega de materiales para un consorcio de construcción en cali. Universidad Santiago de Cali. | |
dc.identifier.uri | https://repositorio.usc.edu.co/handle/20.500.12421/7802 | |
dc.language.iso | es | |
dc.publisher | Universidad Santiago de Cali | |
dc.publisher.faculty | Facultad de Ingeniería | |
dc.publisher.program | Ingeniería Industrial | |
dc.pubplace.city | Cali | |
dc.pubplace.state | Valle del Cauca | |
dc.rights.acceso | Acceso Abierto | |
dc.rights.cc | Reconocimiento 4.0 Internacional (CC BY 4.0) | |
dc.source.institution | Universidad Santiago de Cali | |
dc.source.repository | Repositorio Institucional USC | |
dc.subject | Control | |
dc.subject | Inventario | |
dc.subject | Ciclo Deming (PHVA) | |
dc.subject | análisis ABC | |
dc.subject | Cantidad óptima de pedido (EOQ) | |
dc.subject | TIC | |
dc.title | Propuesta de control inventarios en la bodega de materiales para un consorcio de construcción en cali | |
dc.type | Thesis |
Files
Original bundle
1 - 4 of 4
No Thumbnail Available
- Name:
- Constancia de Radicación.pdf
- Size:
- 145.58 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Trabajo de Grado.pdf
- Size:
- 353.75 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Formato de Autorización.pdf
- Size:
- 1.82 MB
- Format:
- Adobe Portable Document Format
License bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- license.txt
- Size:
- 1.71 KB
- Format:
- Item-specific license agreed upon to submission
- Description: