Propuesta de programa de mantenimiento preventivo basado en el Mantenimiento Preventivo Total (TPM) para la flota de tracto camiones de la empresa Transportes al Mundo SAS

dc.contributor.advisorGarcía Jiménez, Juan Camilo (Director)
dc.contributor.authorDaza Bejarano, Helmer Andrés
dc.contributor.authorTamayo Culman, Carlos Eduardo
dc.creator.degreeTrabajo de Grado para optar al tĂ­tulo de Ingeniero Industrial
dc.date.accessioned2025-10-03T21:04:11Z
dc.date.available2025-10-03T21:04:11Z
dc.date.issued2019
dc.descriptionLa mejora continua y la estandarizaciĂ³n de actividades, generan una mayor capacidad para anticiparse ante diversas problemĂ¡ticas que se generan dentro del departamento de producciĂ³n. De igual manera, el buen aprovechamiento de los recursos fĂ­sicos dentro de la parte operativa genera no solo una preocupaciĂ³n en relaciĂ³n con los costos, sino tambiĂ©n por generar procesos limpios y amigables con el medioambiente. Este proyecto, es una Propuesta de Programa de Mantenimiento Preventivo basado en el Mantenimiento Productivo Total (TPM) (siglas en inglĂ©s), para parte de la flota de tracto camiones de la empresa Transportes al Mundo SAS, el cual es planteado como un mĂ©todo estratĂ©gico estandarizado, para minimizar costos de reparaciĂ³n y aumentar la productividad. Para el desarrollo de esta investigaciĂ³n se propone la evaluaciĂ³n de las problemĂ¡ticas del Ă¡rea de mantenimiento, considerando el costo, la practicidad y la eliminaciĂ³n de los tiempos muertos, en funciĂ³n de mejorar de manera rĂ¡pida y precisa esta Ă¡rea de la empresa, seguido de esto, se plantea comparar y validar informaciĂ³n ante la empresa. Los vehĂ­culos forman parte de una cadena o lĂ­nea productiva y deben estar en el mejor estado para cumplir con los contratos establecidos por la empresa para generar confianza ante sus clientes. Este estudio propone la ejecuciĂ³n de las siguientes acciones que mejoraran la situaciĂ³n actual del Ă¡rea de mantenimiento de la empresa: realizar un diagnĂ³stico general de la gestiĂ³n de mantenimiento, ajustar acciones al grupo 1 de tractocamiones y complementar con las experiencias de los involucrados en los procesos de producciĂ³n y mantenimiento.
dc.description.abstractContinuous Improvement and standardization of activities generate a greater capacity to anticipate various problems that are generated within the production department. In the same way, the good use of physical resources within the operative part generates not only a concern in relation to costs, but also to generate clean and friendly processes with the environment. This project is a Proposed Preventive Maintenance Program based on Total Productive Maintenance (TPM), for part of the truck tract fleet of the company Transportes al Mundo SAS, which is proposed as a strategic method standardized, to minimize repair costs and increase productivity. For the development of this investigation, the evaluation of the problems of the maintenance area is proposed, considering the cost, the practicality and the elimination of the dead times, in order to improve in a fast and precise way this area of the company, followed by this, it is proposed to compare and validate information before the company. The vehicles are part of a chain or production line and must be in the best state to comply with the contracts established by the company to generate confidence before its customers. This study proposes the execution of the following actions that will improve the current situation of the maintenance area of the company: perform a general diagnosis of maintenance management, adjust actions to group 1 of trucks and complement with the experiences of those involved in the processes of production and maintenance.
dc.formatapplication/pdf
dc.format.extent10 pĂ¡ginas
dc.identifier.citationDaza Bejarano, H. A., & Tamayo Culman, C. E. (2019). Propuesta de programa de mantenimiento preventivo basado en el Mantenimiento Preventivo Total (TPM) para la flota de tracto camiones de la empresa Transportes al Mundo SAS. Universidad Santiago de Cali.
dc.identifier.urihttps://repositorio.usc.edu.co/handle/20.500.12421/8542
dc.language.isoes
dc.publisherUniversidad Santiago de Cali
dc.publisher.facultyFacultad de IngenierĂ­a
dc.publisher.programIngenierĂ­a Industrial
dc.pubplace.cityCali
dc.pubplace.stateValle del Cauca
dc.rights.accesoAcceso Privado
dc.rights.ccReconocimiento 4.0 Internacional (CC BY 4.0)
dc.rights.urihttps://creativecommons.org/licenses/by/4.0/
dc.source.institutionUniversidad Santiago de Cali
dc.source.repositoryRepositorio Institucional USC
dc.subjectMejora Continua
dc.subjectMantenimiento Productivo Total (TPM)
dc.subjectPrograma de Mantenimiento Preventivo
dc.subjectTracto camiones
dc.subject.keywordContinuous Improvement
dc.subject.keywordTotal Productive Maintenance (TPM)
dc.subject.keywordPreventive Maintenance Program
dc.titlePropuesta de programa de mantenimiento preventivo basado en el Mantenimiento Preventivo Total (TPM) para la flota de tracto camiones de la empresa Transportes al Mundo SAS
dc.typeThesis
dc.type.spaInvestigaciĂ³n

Files

Original bundle
Now showing 1 - 3 of 3
No Thumbnail Available
Name:
Acta.pdf
Size:
1.8 MB
Format:
Adobe Portable Document Format
No Thumbnail Available
Name:
Formato de AutorizaciĂ³n.pdf
Size:
312.44 KB
Format:
Adobe Portable Document Format
No Thumbnail Available
Name:
Trabajo de Grado.pdf
Size:
166.32 KB
Format:
Adobe Portable Document Format